Aryan Gupta

SCHOLAR // ASPIRING QUANT // DEVELOPER

Welcome to the digital Sanctum. I am a Year 12 scholar aspiring to pursue a double degree in Actuarial Studies and Computer Science at UNSW, with the ultimate goal of transitioning into quantitative trading. While I occasionally write software in my leisure, my primary repository of projects can be explored via the GitHub ledger linked below. You are most welcome to connect with me on LinkedIn.

Additionally, I curate and share VCE resources to support fellow students in their academic journeys. To the right, you will find my systems engineering project, VISOR, alongside my “expedition logs” — documenting volunteering initiatives in Cambodia and Vietnam.

The Scholar's Desk

Click a volume to open it — use arrows to turn pages

V
V.I.S.O.R
TECHNICAL DOSSIER
CLASSIFIED
Open Dossier →
CLEARANCE: DELTA-4
DISTRIBUTION: RESTRICTED
REF: VIS-2024-001

Visual Inspection &
Smart Occupational Relief
System Overview

V.I.S.O.R is a real-time stereoscopic HUD for industrial hazard identification. Edge-deployed inference at sub-5ms latency using dual 4K optical sensors.

The optical array fuses LIDAR depth maps with RGB spectral data, enabling classification in up to 85% occlusion environments.

PG. 1
Hardware Manifest

[FIG. 1 — Optical Array]

Dual-lens / LIDAR / IMU

V.I.S.O.R Rev. C — 2024

Prototype: Sony IMX678 sensors (64mm baseline) + Hesai XT16 LiDAR + Jetson Orin NX.

PG. 2
Inference Pipeline

Quantized YOLOv9-nano at 87 FPS. Confidence thresholds adjusted dynamically from IMU-derived motion-blur metrics.

VERIFIED
PG. 3
Field Results

[FIG. 2 — Detection Accuracy]

[email protected] = 0.91 across 14 hazard classes

Benchmark: Site Alpha, 2024

0 false negatives across 400 operational hours at 3 construction sites.

PG. 4
V.I.S.O.R Project
Aryan Gupta — Melbourne 2024
AG
Expedition
Logs
FIELD ARCHIVES 2024-25
VERIFIED
Open Logs →
Vietnam — 2024
Cambodia — 2025

Infrastructure Deployment
Clinical Outreach
Community Education
Vietnam
Mekong Delta — 2024

Deployed with 47-person team to construct 4.2 km of rural transit infrastructure across three flood-prone sub-districts of the Mekong Delta region.

Activities: aggregate laying, drainage installation, coordination with local civil engineers.

PG. 1
Site Survey

[FIG. 1 — Mekong Transit Route]

4.2 km · 3 sub-districts · 14 days

Infrastructure Log — Vietnam 2024

Route deviation of 340m on Day 6 following seasonal inundation assessment.

PG. 2
Cambodia
Phnom Penh District — 2025

Clinical outreach rotation. Triage documentation, patient intake, and primary literacy modules delivered to 60+ students across two village schools.

RESTRICTED
PG. 3
Clinical Log

[FIG. 2 — Outreach Site Map]

Hospital · 2 Schools · Health Screening

Cambodia Field Record — 2025

Screening reached 210 patients. Abnormal findings flagged in 14% of cases for referral.

PG. 4
Filed: March 2025
Author: Aryan Gupta

Field notes from personal journals & mission briefings.
AG